Aufgabenträger · Hessen

Rhein-Main-Verkehrsverbund GmbH

Abbreviation
RMV
Land / remit
Hessen
Legal form
GmbH (public ownership)
Seat
Hofheim am Taunus
Alte Bleiche 7, 65719 Hofheim am Taunus
Website
www.rmv.de
Management
Managing director(s) per the authority's Impressum. Names rotate; always check the current Impressum for the authoritative list.

Background

Founded 1994 as the regional transport association for the state of Hessen; Aufgabenträger for the entire Land. Shareholders are the Land Hessen, the districts and cities of the catchment area. Operates one of the densest S-Bahn and regional-rail networks in Germany, including the Frankfurt S-Bahn and the Rhein/Main-Neckar corridor, and has increasingly used Land-side guarantees in its most recent hydrogen-train and battery-train procurements.

Remit and mandate

SPNV-Aufgabenträger for Rhein-Main Hesse (Regierungsbezirke Darmstadt and Gießen).

Tender pipeline — Wettbewerbsfahrplan 2025

The following lots are listed in the 2025 Wettbewerbsfahrplan (BSN) with this authority as the lead or as a participating authority. Leadership counts: 20 lot(s) as lead authority, 9 lot(s) as participating authority.

As lead authority

No. 61

S 2

Gross · Negotiated procedure with prior call for competition
Contract term
09.12.2029 — TBD
Services
S-Bahn · Electric · 2,01 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
S 2 Niedernhausen – Dietzenbach
No. 180

Kinzigtal

Gross · Other / TBD
Contract term
09.12.2040 — TBD
Services
RB + RE · Electric · 3,28 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
HE 5 Frankfurt – Fulda RE 50 Frankfurt – Bebra RB 51 Frankfurt – Wächtersbach (– Bad Soden-Salmünster)
No. 47

Regionaltangente West

Gross · Negotiated procedure with prior call for competition
Contract term
10.12.2028 — TBD
Services
TBD · Electric · — M train-km/yr
Rolling stock
Pool: yes · New-build: yes · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RTW 1: Bad Homburg – F-Höchst – F-Flughafen – Neu-Isenburg Birkengewann RTW 2 / 3: F-Praunheim – / Bad Soden – F-Höchst – F-Flughafen – Dreieich-Buchschlag
No. 146

Taunus

Gross · Other / TBD
Contract term
10.12.2034 — TBD
Services
RB · Fuel cell · 1,80 M train-km/yr
Rolling stock
Pool: yes · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 11 Bad Soden – Frankfurt-Höchst (– Kelkheim) RB 12 Königstein – Frankfurt-Höchst – Frankfurt RB 15 Brandoberndorf – Usingen (– Friedrichsdorf – Frankfurt) RB 16 Friedberg – Friedrichsdorf – Bad Homburg
No. 110

Gallus

Gross · Negotiated procedure with prior call for competition
Contract term
11.12.2032 — 14.12.2054
Services
S-Bahn · Electric · 6,90 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
S 3 Bad Soden – Darmstadt Hbf S 4 Kronberg – Langen S 5 Usingen – Hanau Hbf S 6 Friedberg – Frankfurt Süd
No. 134

Südhessen-Untermain

Gross · Other / TBD
Contract term
11.12.2033 — TBD
Services
RB + RE · Electric · 2,48 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 58 (Laufach –) Aschaffenburg – Frankfurt RE 59 Aschaffenburg – Frankfurt Flughafen RB 75 Wiesbaden – Aschaffenburg
No. 112

Ländchesbahn

Gross · Other / TBD
Contract term
12.12.2032 — TBD
Services
RB · TBD · 0,52 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 21 Limburg (Lahn) – Niedernhausen – Wiesbaden
No. 117

Main-Neckar-Ried

TBD · Other / TBD
Contract term
12.12.2032 — TBD
Services
RB + RE · Electric · 3,33 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 60 Mannheim – Frankfurt RB 67 Mannheim – Frankfurt RB 68 Heidelberg – Frankfurt RE 70 Frankfurt – Mannheim
No. 122

Wetterau West-Ost

Gross · Other / TBD
Contract term
12.12.2032 — TBD
Services
RB · Battery · 1,59 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 46 Gießen – Gelnhausen RB 47 Lich / Hungen – Wölfersheim-Södel – Friedberg (– Frankfurt) RB 48 Nidda – Friedberg (– Frankfurt) Lumdatalbahn: Gießen – Lollar – Londorf
No. 172

Rheingau-Express

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RB + RE · Electric · 0,87 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RB 10 Neuwied – Koblenz – Frankfurt [Einzelf.] RE 19 (Kobern-Gondorf –) Koblenz – Frankfurt
No. 173

Mittelhessen

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RB · Electric · 4,27 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 37 (Kirchhain –) Gießen – Frankfurt RB 40 Dillenburg – Gießen – Frankfurt RB 41 Schwalmstadt-Treysa – Gießen – Frankfurt RB 49 (Gießen -) Friedberg – Hanau
No. 174

Rheingau

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RB · Electric · 2,97 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 10 Neuwied – Koblenz – Wiesbaden – Frankfurt
No. 175

Lahntal-Vogelsberg-Rhön

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RB + RE · Battery · 3,16 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 24 Limburg – Gießen RB 45 Limburg – Gießen – Fulda RB 52 Gersfeld (Rhön) – Fulda
No. 176

Main-Weser

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RE · Electric · 1,22 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 30 Kassel – Frankfurt
No. 177

Main-Lahn-Sieg

Gross · Other / TBD
Contract term
12.12.2038 — TBD
Services
RE · Electric · 2,35 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 98 Kassel – Frankfurt RE 99 Siegen – Frankfurt
No. 162

Kleyer

Gross · Negotiated procedure with prior call for competition
Contract term
14.12.2036 — TBD
Services
S-Bahn · Electric · 7,63 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
S 1 Wiesbaden – Rödermark-Ober-Roden S 7 Riedstadt-Goddelau – Frankfurt S 8 Wiesbaden Hbf – Hanau Hbf S 9 Wiesbaden Hbf – Hanau Hbf
No. 163

Taunusstrecke

Gross · Other / TBD
Contract term
14.12.2036 — TBD
Services
RB + RE · Electric · 1,49 M train-km/yr
Rolling stock
Pool: TBD · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 20 / RB 22 Limburg – Niedernhausen – Frankfurt
No. 67

Niddertal

Gross · Open procedure
Contract term
15.12.2030 — 09.12.2045
Services
RB · Electric · 0,96 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RB 34 Glauburg-Stockheim – Frankfurt
Remarks
Electrification planned
No. 71

Dreieich

Gross · Negotiated procedure with prior call for competition
Contract term
15.12.2030 — TBD
Services
RB · Battery · 0,51 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 61 Dieburg – Frankfurt
Remarks
Planned consolidation with sub-network Odenwald geplant
No. 82

Odenwald

Gross · Negotiated procedure with prior call for competition
Contract term
15.12.2030 — TBD
Services
RB + RE · Battery · 2,12 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 66 Darmstadt – Pfungstadt RE 80 Erbach – Darmstadt RB 81 Eberbach – Darmstadt RB 82 Eberbach – Frankfurt RE 85 Erbach – Frankfurt RB 86 Groß-Umstadt Wiebelsbach – Hanau RB 61 Dieburg – Frankfurt [Einzelfahrten]
Remarks
Planned consolidation with sub-network Dreieich geplant

As participating authority

No. 92

11NOH (NOH-Netz)

Gross · Other / TBD
Contract term
01.12.2031 — 09.12.2046
Services
RB + RE · Electric · 4,93 M train-km/yr
Rolling stock
Pool: no · New-build: TBD · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RB 5 Fulda – Bad Hersfeld – Bebra – Melsungen – Kassel-Wilhelmshöhe – Kassel Hbf RE 6 (Eisenach –) Bebra – Melsungen – Kassel-Wilhelmshöhe – Kassel Hbf RB 6 Eisenach – Bebra RB 83 Göttingen – Eichenberg – Hann Münden – Kassel Hbf RB 87 Göttingen – Eichenberg – Eschwege – Bebra
Remarks
Derzeit Prüfung auf notwendige Verschiebung des Betriebsstarts and / oder gestaffelte Betriebsaufnahme wegen Generalsanierungen and ETCS
No. 109

12NWH (NWH-Netz)

Gross · Other / TBD
Contract term
01.12.2032 — 15.12.2047
Services
RB · TBD · 3,00 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: pre-equipped
Operator
Not yet awarded / see authority
Lines
RB 4 Korbach – Bad Arolsen – Wolfhagen – Kassel-Wilhelmshöhe RB 39 Bad Wildungen – Wabern – Kassel-Wilhelmshöhe – Kassel Hbf RB 94 Erndtebrück – Bad Laasphe – Biedenkopf – Marburg RB 97 Brilon – Korbach – Frankenberg – Marburg
Remarks
potentially teilweise geänderter Zuschnitt des Netzes je nach Tractionsart in Prüfung (wg. Nachladen an Oberleitung)
No. 46

E-Netz Mainfranken Übergang

TBD · Negotiated procedure without prior call
Contract term
10.12.2028 — 14.12.2030
Services
RB + RE · Electric · 5,10 M train-km/yr
Rolling stock
Pool: no · New-build: no · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RE 10 Nürnberg – Würzburg RB 53 Flieden – Würzburg – Bamberg RB 79 Aschaffenburg - Gemünden RB 80 Würzburg – Marktbreit
No. 49

Main-Spessart Übergang

TBD · Negotiated procedure without prior call
Contract term
10.12.2028 — 14.12.2030
Services
RE · Electric · 2,70 M train-km/yr
Rolling stock
Pool: no · New-build: no · ETCS: no
Operator
Not yet awarded / see authority
Lines
RE 54 Frankfurt – Maintal – Würzburg – Bamberg RE 55 Frankfurt – Offenbach – Würzburg
No. 95

Südwest-Expressnetz (SWEN)

Gross · Negotiated procedure with prior call for competition
Contract term
14.12.2031 — 09.12.2046
Services
RE · Electric · 6,90 M train-km/yr
Rolling stock
Pool: no · New-build: yes · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RE 1 Koblenz – Saarbrücken – Mannheim (-Heidelberg) RE 2 Koblenz – Bingen - Meinz - Frankfurt(Main) RE 4 Frankfurt(Main) – Mainz - Ludwigshafen – Karlsruhe RE 14 Frankfurt(Main) – Mainz - Ludwigshafen – Mannheim
No. 74

Regionalverkehr Mainfranken - Los 1

Other · Open procedure
Contract term
15.12.2030 — 13.12.2042
Services
RE · Electric · 4,20 M train-km/yr
Rolling stock
Pool: no · New-build: no · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RE 10 Würzburg – Neustadt/Aisch – Nürnberg RE 54 Frankfurt – Maintal – Würzburg – Bamberg RE 55 Frankfurt – Offenbach – Würzburg – Bamberg
Remarks
Nettovertrag mit Bruttoanlaufphase
No. 75

Regionalverkehr Mainfranken - Los 2

Other · Open procedure
Contract term
15.12.2030 — 13.12.2042
Services
RB · Electric · 3,10 M train-km/yr
Rolling stock
Pool: no · New-build: no · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RS 1 Marktbreit - Würzburg - Flieden RS 2 Würzbuerg - Bamberg RS 4 Würzburg - Kitzingen RS 11 Würzburg - Gemünden RB 79 Aschaffenburg – Gemünden
Remarks
Nettovertrag mit Bruttoanlaufphase neue Line routings and Line names im Zuge der Regio- S-Bahn Mainfranken geplant
No. 77

Folgeverträge Eifel-Westerwald- Sieg-Netz

Gross · Other / TBD
Contract term
15.12.2030 — TBD
Services
RB + RE · TBD · 6,10 M train-km/yr
Rolling stock
Pool: no · New-build: TBD · ETCS: TBD
Operator
Not yet awarded / see authority
Lines
RB 23 Limburg(Lahn) – Mayen Ost RE 25 Gießen – Koblenz RB 29 Limburg – Siershahn RB 38 Andernach – Kaisersesch RB 90 Limburg(Lahn) – Au(Sieg) – Siegen RB 91 Hagen – Siegen RB 92 Finnentrop – Olpe RB 93 Betzdorf(Sieg) – Bad Berleburg RB 95 Dillenburg – Siegen RB 96 Betzdorf(Sieg) – Dillenburg
Remarks
Neuer Network perimeter under discussion
No. 84

Kahlgrundbahn Übergang

TBD · Other / TBD
Contract term
15.12.2030 — TBD
Services
RB · TBD · 0,40 M train-km/yr
Rolling stock
Pool: no · New-build: TBD · ETCS: retrofit
Operator
Not yet awarded / see authority
Lines
RB 56 Hanau – Schöllkrippen
Remarks
catenary-independent

Source: Bundesverband SchienenNahverkehr (BSN), Wettbewerbsfahrplan 2025. Data are as published in the Wettbewerbsfahrplan and have not been independently verified against the underlying tender documentation.

Further reading

Last reviewed: 18 April 2026.